Search

Home > HistoryPod > 21st July 1970: Construction of Egypt’s Aswan High Dam is completed
Podcast: HistoryPod
Episode:

21st July 1970: Construction of Egypt’s Aswan High Dam is completed

Category: Society & Culture
Duration: 0
Publish Date: 2017-07-20 21:05:51
Description: On the 21st July 1970, construction was completed on the Aswan High Dam in Egypt. Taking just over ten years to build, the High Dam cost nearly $1 billion.  However, it’s estimated that this cost was recovered in less than five years thanks to income from increased agricultural production and hydroelectric generation, as well as savings from flood protection and improved navigation. A dam had already been built across the Nile near the southern Egyptian city of Aswan in 1902. It was designed to store the Nile’s annual floodwater and release it during the dry season in order to irrigate ...
Total Play: 0

Users also like

100+ Episodes
Chips with e .. 50+     9
700+ Episodes
Desert Islan .. 2K+     90+
200+ Episodes
Learn Spanis .. 1K+     100+
90+ Episodes
LSE IQ podca .. 90+     10+
100+ Episodes
ITV 6 Nation .. 20+     1