|
AI is pushing the grid to its limits — and transformers are now the critical path for both data centers and renewable projects. Today’s guest, Doug Banty, EVP at Forgent (and former CEO of MGM Transformers), sits at the intersection of these two worlds. Half of his week at RE+ was spent across the strip at the Yotta data center conference, where the only topic on everyone’s mind was power. In this episode, Doug explains how AI-driven rack density is rewriting the entire powertrain, why hyperscalers are treating speed like an existential priority, and what this means for developers trying to keep pace. He also breaks down the industrial logic behind Forgent — a merger of MGM, VanTran, States, and PowerCube — and how integrated solutions are becoming essential for execution in an era where timelines matter more than price. Expect to learn: ⚡ Why data centers are moving at crisis-level urgency ⚡ The difference between power and distribution transformers ⚡ What MGM’s 500,000 sq ft Waco factory means for lead times ⚡ How Forgent reduces execution risk through integrated packages ⚡ The single most effective way developers can avoid delays Hit play — and see what the future of the grid really looks like. |